Timesheets and billing software, built into your ATS
Contract billing breaks down when hours, approvals, pay rules, and invoices live in different places.
This guide shows how one placement can move from setup to payroll-ready pay data without re-keying the placement, and how to check whether the workflow fits your agency.
A worked week: from placement setup to payroll-ready pay
Follow one placement through six stages. In the worked example, a senior developer works 41.5 hours in a week: 40 regular hours plus 1.5 overtime hours. The contractor pay rate is $60.00 per hour and the client bill rate is $85.71 per hour, producing $2,535.00 in pay, $3,621.43 in billings, and $1,086.43 in margin at 30%. A $42.00 train-ticket reimbursement brings the invoice total to $3,663.43. Use the same numbers to test your own rates before enabling the feature for live placements.
Six-step checklist for a contract placement
- Enable timesheets on the placement. Set contractor pay, choose margin, markup, or a fixed bill rate, select a rule template and approvers, and let periods be created from job dates.
- Let the contractor log hours and expenses in a contractor portal from desktop or a mobile browser. Automatic reminders chase missing entries.
- Send the timesheet to the client portal for approval or rejection. Overtime is visible, and each decision is recorded in an audit trail.
- Apply the rule engine once to both sides. Overtime, unpaid breaks, and premiums calculate together so pay, bill, and margin agree.
- Turn approved time into a branded invoice with expense receipts attached, then track it until payment.
- Export approved pay as XLSX or CSV, or pull it through the API, for the payroll provider to handle tax and payments.
Rule engine: what to configure and what to verify
Rule templates can combine work schedules, unpaid breaks, before- and after-shift windows, specific time ranges, daily and weekly overtime, multipliers, and fixed rates. Different clients and engagements can use different templates. Hours outside the schedule can be paid at the standard 1x rate with a single toggle, or left for the rules to decide. Rules apply automatically when timesheets are submitted.
Use this check before choosing a template: confirm the overtime threshold, whether daily and weekly overtime can double-count, which premiums apply, how breaks are treated, and whether unplanned hours should use the 1x toggle. A separate illustrative example uses 45 hours, weekly overtime after 40 hours at 1.5x, a $60.00 pay rate, and a 30% margin, resulting in $2,850.00 pay, $4,071.00 billed, and $1,221.00 margin.
Connected timesheets versus a standalone tool
The main distinction is connection. A generic timesheet tool may handle standard hours and basic overtime, but complex calculations often move to spreadsheets, and the tool may run separately from contractors, clients, jobs, and billing. In the connected model, each timesheet links to its contractor, client, job, contact, and deal; invoices are created from approved hours with reimbursement receipts included; and bulk actions can cover up to 3,000 records with flags, filters, reminders, and activity history.
Flexibility is also per engagement: approver roles, currencies, time intervals, and clock formats can differ. Reports can show billables, payables, gross profit, and margin percentage across the book or by company, job, or contractor, with missing and rejected entries flagged.
Decision checklist before enabling timesheets
Before you commit, check these points:
- Can each client have different pay and bill rules without duplicating placements?
- Are contractor and client portals both available, with separate reminders for contractors, clients, and recruiters?
- Can expenses be raised by contractors and reviewed by the agency and client?
- Does reporting show margin by company, job, and contractor, and can you drill into the timesheets behind a figure?
- Can you create, update, approve, remind, invoice, export, or delete up to 3,000 records at once?
- Is the payroll boundary clear: pay is calculated here, while tax withholding and deposits stay with the payroll provider?
- Are XLSX, CSV, and API export enough for your payroll and accounting workflow today, given that direct accounting sync is coming soon?
Frequently asked questions
How are contractor pay and client bill rates calculated?
A reusable rule engine applies the same logic to contractor pay and the client bill at the same time. You can price the bill side by margin, markup, or a fixed rate, and build templates from schedules, unpaid breaks, shift windows, time ranges, daily and weekly overtime, multipliers, and fixed rates. Because both sides use one set of rules, pay, bill, and margin stay aligned.
Why use timesheets built into an ATS?
Keeping timesheets on the placement record removes separate tools for time capture, overtime math, invoicing, and manual exports. Hours, approvals, rates, and invoices remain linked to the contractor, client, job, contact, and deal, so placement details do not need to be re-entered.
What is timesheet and billing software for contract staffing agencies?
It tracks contractor hours, collects client approvals, calculates pay and bill amounts, and produces client invoices. When it runs inside the ATS and CRM, each timesheet stays connected to the contractor, client, job, contact, and deal it belongs to.
How is Timesheets priced?
Timesheet pricing is typically structured around active contractors rather than seats or logins, so the cost scales with the number of people whose hours you actually track. A common model charges a monthly credit amount per active contractor, with the per-contractor rate stepping down as the contractor count grows. To evaluate a quote, ask three things: what counts as an active contractor in a given month, whether the credit-to-currency conversion is fixed or varies by plan, and where the volume tiers begin and end. Compare the resulting monthly total against the margin you expect to earn on those placements, and confirm the current rates and tier boundaries on the pricing page before budgeting.
How long does setup take?
Setup is usually lighter than a standalone timesheet deployment because the feature sits inside the account you already use for placements, so there is no separate system to install or maintain. A typical onboarding sequence runs in three stages: enable timesheets at the account level, switch on tracking for the contractors you want to cover while setting their rates and rule templates on the placement itself, and send portal invitations so contractors can begin logging time and clients can begin approving it. The elapsed time depends on how many placements you enable at once and how quickly contractors accept their invitations; treat any specific timeline as something to confirm with the provider rather than assume.
Is this a full payroll system?
No. The product calculates contractor pay and client billing from approved timesheets, but it does not run payroll itself. Tax withholding, statutory deductions, and direct deposits remain the responsibility of the agency's payroll provider. The handoff is the approved pay data: export it as XLSX or CSV, or pull it through the API, and pass it to the payroll provider for processing. When evaluating the boundary, confirm which fields the export includes, how corrections to already-approved time are handled, and whether the payroll provider can ingest the file format without manual reformatting.
Does it work with accounting and payroll tools?
Timesheet data can be exported as XLSX or CSV, and individual or bulk records can be pulled through the API, which covers most payroll and accounting handoffs today. Direct accounting integrations, such as syncing invoices to QuickBooks or Xero, should be treated as a separate question: confirm with the provider whether a given connector is live, in beta, or still planned before you build a process around it. If a direct sync is not yet available, plan for a periodic export-and-import step and check that your accounting tool accepts the exported format without re-keying.